Keep your competitive edge

Losing sleep because competitors are underbidding you, insurance premiums are skyrocketing, OSHA citations are looming and rod workers keep leaving due to injuries and harsh working conditions?

Take back your power to compete in today’s marketplace with the Kodi Klip System, the revolutionary new solution to the century-old concrete reinforcement problem. Our automated system works on any construction site and is ideal for high-density mats in bridges, roads or slabs. You get a secure four-way grip that holds tight, eliminates racking and streamlines work flows. Your employees get a new set of tools that enable them to work faster with fewer injuries. It all adds up to lower costs, more profits and fewer headaches for you!

  

Thompson Bridge located in Blount County Tennessee, March 2010– A One Lane Bridge that is being replaced with a two lane Bridge by Tennessee Department of Transportation (TDOT), Mountain State Contractors and Britton Bridge local contractors.

The bridge contractor had already started wiring the #6 rebar when they decided to use Kodi Klips.The yellow 626 Klip for #6 rebar was used on the first rebar deck layer. The Thompson Bridge is the first bridge in Tennessee that uses the Kodi Klip Rebar Connection System.

The contractors rebar placers and wire tiers took very little time to learn the Kodi Klip Rebar System, once training was completed they connected the two KTA 626 Klip Applicators to their compressors and started connecting rebar, the ease of use and speed was noticed immediately.

   

   

   

   

For more information, call (615) 449-1880, (888) 588-5547 toll-free or email us at info@kodiklip.com.